Port Rives in Thonon-les-Bains is the first Lake Geneva destination on the Aqua superPower network, featuring an Aqua 75 DC station with twin CCS2 connectors allowing two vessels to charge simultaneously in 20–40 minutes.
Charging details
- Charger type
- Aqua 75 DC marine fast charger
- Verified power output
- 75 kW
- Operator
- Aqua superPower
- Access
- public
- Waterbody
- Lake Geneva
Verify before arrival
First Lake Geneva Aqua superPower station. Twin CCS2 connectors. 800 moorings, 58 visitor berths. Inaugurated May 27, 2025.
Something incorrect?
Help keep this listing accurate. Report an update and we'll review it before publishing.
Station details
Location
Thonon-les-Bains
Haute-Savoie
France
~
Waterbody
Lake Geneva
Charger
Aqua 75 DC marine fast charger
75 kW
Last verified: 2026-09-23